View Our Website View All Jobs

Construction Project Scheduler

Project Description:

  • Scheduling for 2-5 project managers at any given time.
  • Will be assuming project schedules that are in place or in progress.
  • Will be participating in project update calls throughout the day.
  • Might go on project walk downs to review the work they are scheduling.
  • Particular types of project experience: Civil, Electrical, Telecom or Gas company construction project Scheduling. 
  • Years of experience: Will consider less than 5-8 if candidate has strong P6 experience.
  • Candidate will visit each project at least three times (beginning, middle, end).
  • Types of projects: Electrical, overhead, relay, substation – typical electrical utility types of programs (electrical utility industry scheduling experience is not a must).
  • Size of projects: Typically from $500,000 and up ($25,000,000 at the top).
  • Team dynamic: Team of about 14 schedulers; interface with PM’s based on the rhythm established between the PM’s and the Schedulers; most of the time working in the office with other Schedulers; lots of shared learning – meet as a team if there are things going on with particular projects that could be a good learning opportunity for the team; try to make sure the Schedulers are involved in the project planning as much as possible.

Requirements:

  • Must know P6 and be able to jump in on existing schedules.
  • Need to be able to build a schedule from a Project Diagram or a verbal Scope of Work.
  • Need strong interpersonal skills as they will be reaching out to Project managers, etc.
  • Need good analytical skills for presentations.

Preferred:

  • Microsoft Project is preferred.
Read More

Apply for this position

Required*
Apply with Indeed
Attach resume as .pdf, .doc, or .docx (limit 5MB) or Paste resume

Paste your resume here or Attach resume file