View Our Website View All Jobs

P6 Construction Project Scheduler

Academic/Formal Training: Bachelor’s degree in Business or Technical Field and 5- 8 years related scheduling experience, or in lieu of Bachelor’s degree, a minimum of 9– 12 years relevant scheduling experience is required.

Requirements/Details:

  • Scheduling for 2-5 project managers at any given time
  • Will be assuming project schedules that are in place or in progress
  • Also need to be able to build a schedule from a Project Diagram or a verbal Scope of Work
  • Need them to have experience with P6 where experience with Microsoft Project is a nice to have
  • Participating in project update calls throughout the day
  • Might go on project walk downs to review the work they are scheduling
  • Need strong interpersonal skills as they will be reaching out to Project managers, etc.
  • Schedulers will need to have the initiative to go and find the information that they need rather than waiting for updates
  • Need good analytical skills
  • Particular types of project experience: Civil, Electrical, Telecom or Gas company construction project Scheduling would be the likely pool from which these candidates could be pulled
  • P6 experience is required
  • Years of experience: will consider less than 5-8 if they have strong P6 experience
  • Out in the field:  will visit each project at least three times (beginning, middle, end)
  • Types of projects:  Electrical, overhead, relay, substation – typical electrical utility types of programs (electrical utility industry scheduling experience is not a must)
  • Size of projects:  Typically from $500,000 and up ($25,000,000 at the top)
  • Team dynamic:  team of about 14 schedulers; interface with PM’s based on the rhythm established between the PM’s and the Schedulers; most of the time working in the office with other Schedulers; lots of shared learning – meet as a team if there are things going on with particular projects that could be a good learning opportunity for the team; try to make sure the Schedulers are involved in the project planning as much as possible
Read More

Apply for this position

Required*
Apply with Indeed
Attach resume as .pdf, .doc, .docx, .odt, or .rtf (limit 5MB) or Paste resume

Paste your resume here or Attach resume file